GREENSBORO, N.C. (AP) — Noah Farrakhan scored 17 points and Xzavier Long made the first of two free throws with two seconds left to rally Hampton to a 74-73 victory over North Carolina A&T on Monday night.
Farrakhan added six assists and three steals for the Pirates (10-9, 3-4 Coastal Athletic Association). George Beale had 13 points and Long scored eight.
Landon Glasper had 21 points to lead the Aggies (4-16, 0-7), who have lost seven in a row. Ryan Forrest scored 20 and Jahnathan Lamothe finished with 13 points and 17 rebounds.
Farrakhan scored 11 points to guide Hampton to a 39-29 lead at halftime
___
The Associated Press created this story using technology provided by Data Skrive and data from Sportradar.